Make our experience your benefit.

GUBING GROUP International works for many companies in the public and private sector. We therefore gain experience that we are happy to pass on to you. Take a look at our work and then contact us. We are sure that we can do something for you.

 

Electrification of Hochrheinbahn railway line

Description: Upgrading and electrification of “Hochrheinbahn” railway line from Basel Bad Bf to Bf Erzingen (Baden)

Service: Preparation, request for proposal and assisting the awarding of contract for planning services and expert services; consultancy services for project management, contract management and claim management

Client: DB Netz AG, Regionalbereich Südwest

Performed by: GUBING GROUP International GmbH

Time period: 2018 - today

Pachyderm-house

Description: New pachyderm-house at Zoo Berlin Friedrichsfelde, approx. 10.000 sqm utility-space

Service: Sectoral planning of the building services for sanitary facilities, heating, ventilation and air conditioning, electrical installation, fire protection and building automation

Client: Tierpark (Zoo) Berlin Friedrichsfelde GmbH

Performed by: kando Ingenieure GmbH as Subcontractor of IGP Ingenieure AG

Time period: 2019 - today

Electrification of Bodenseegürtelbahn railway line

Description: Upgrading and electrification of the “Bodenseegürtelbahn” railway line from Bf Radolfzell to Bf Friedrichshafen

Service: Preparation, request for proposal and assisting the awarding of contract for planning services and expert services; consultancy services for project management

Client: DB Netz AG, Regionalbereich Südwest

Performed by: GUBING GROUP International GmbH

Time period: since 2020

Maisan Combined Cicle Power Plant, Maisan, Irak

Description: Construction of an Combined Cicle Power Plant with installed 800MW in Maisan, Irak

Service: Consultant for the underground work as well as for the structural engineering including the turn-key construction of the buildings

Client: ILF Consulting Engineers, Abu Dhabi

Performed by: Projektmanagement Matthias Flocke

Time period: 2019 - 2022

Railway Tunnel Wittighausen

Description: Tunnel Wittighausen on railway line Neckarelz - Würzburg Heidingsfeld West: Renewal of the 138 m long tunnel with simultaneous widening of the tunnel cross-section and adjustment of the track position to 4.0 m distance according to the current regulations..

Service: Project and structural planning according to HOAI §43 / §51, service phases 5 and 6 of the tunnel including the pre-cut retaining walls

Client: DB Netz AG, Frankfurt

Performed by: K+S Ingenieur-Consult

Time period: November 2017 - September 2019

Viaduct Kürnach

Description: Replacement construction of the “Kürnach Viaduct” along the Autobahn A7 between Fulda and Wurzburg, at motorway section Wurzburg/Estenfeld to motorway junction Biebelried.

Service: Execution planning of the viaduct including construction levels of incremental launching and lateral shifting, building aids for incremental launching, lateral shifting and sheeting

Client: Max Bögl Stiftung & Co. KG, Sengenthal

Performed by: K+S Ingenieur-Consult

Time period: March 2017 - October 2021

Magazine building, Berlin

Description: New magazine building including a library for the Federal Archives of Germany. Construction in several construction-phases
Finckensteinallee 63, 12205 Berlin

Service: Phase 6 to 8 the of HOAI, for certain subsectors also Phase 5 of HOAI

Client: Federal office for Building and Regional Planning (BBR), Berlin, Germany

Performed by: eckert+honegger Architekten GmbH

Time period: third construction sector finished in 2019

Tramline Mainzelbahn

Description: Contract and Claim Management services for the “Mainzelbahn” tram line infrastructure project in Mainz, Germany

Service: Assessment and approval of contracts, settlements and claims; leading of negotiations with contractors on behalf of the owner; providing consultant services to the owner.

Client: MVG – Mainz Transport Corporation, Mainz, Germany

Performed by: BCM GmbH, Berlin Subcontracted: Hellwig Ingenieur-Consult, Hellwig Bau Consult, Gisbert Peters

Time period: 2016 - 2019

Preservation of evidence “Alt-Nied”

Description: Remodelling of the street “Alt-Nied” in Frankfurt am Main, Germany

Service: Architectural preservation of evidence of the interior and exterior areas of all adjacent buildings/residential units of two construction phases

Client: City of Frankfurt/Main, Department for Road Construction and Site Development

Performed by: DMT GmbH & Co. KG, Essen Subcontracted: GUBING GROUP International GmbH

Time period: August 2018 - February 2019

Dismantling of an industrial area

Description: Dismantling of the industrial area “Industriepark” Griesheim/Frankfurt am Main, Germany

Service: Preparation of a real estate-contaminant-registry for the buildings of SGL Carbon SE at the industrial area Griesheim. Site-survey, data research, examination of the basic building-structure, sample-taking for laboratory-analysed studies, evaluation, reporting

Client: Landplus GmbH, Berlin

Performed by: Büro für Umwelt- und Geoservice Jürges

Time period: 2019

Environmental Due Diligence Audits

Description: Environmental Due Diligence Audits for nine rehab-hospitals

Service: Site Survey, registration of environmentally relevant circumstances, data-room-analysis, reporting

Client: Dr. Klimsa Umweltplanung, Potsdam

Performed by: Büro für Umwelt- und Geoservice Jürges

Time period: 2019

Windfarm Sitzerath II

Description: Enercon 3 x E115, 149m hub-height, installed power 9MW, cabling 3km, construction of the operator-owned substation

Service: Project management during the authorisation- and execution phase

Client: GERES mbH & Co. KG

Performed by: Jochen Schäfer

Time period: 2018

Refurbishment of an apartment building

Description: Refurbishment of an apartment building incl. the demolition and reconstruction of the roof framework and the mounting of 6 balconies in the citycenter of Frankfurt am Main

Service: Project management during construction phase

Client: Bote GmbH, Frankfurt am Main, Germany

Performed by: GUBING GROUP International GmbH

Time period: since 2019

Rainwater Retention System

Description: New rainwater retention system as well as surface and network development of the recycling yard area No. 3

Service: Structural design according to HOAI §51 phases 1 to 6 and 8

Client: District office of Nuremberg County,
Sachgebiet 54.2 / Tiefbau / Abfallbeseitigung
Waldluststraße 1, 91207 Lauf a.d. Pegnitz

Performed by: isn² Ingenieurbüro Schöppler Noack Neger

Time period: 2019 - 2020

Renovation of the indoor swimming pool Julius-Leber-Barrack

Description: Renovation of the indoor swimming pool at Julius-Leber-Barrack Berlin; partly subject to legal requirements of monument protection and according to the latest energy-saving guidelines

Services: The indoor swimming pool, built in the 1930s, is part of a monument-protected ensemble of Julius-Leber-Barrack has been renovated constructional and energetically. The focal points of the modernization were the urgent need for structural and energy-related refurbishment, as well as the replacement of outdated plant technology. The result is a state-of-the-art sauna and swimming pool which is also in line with the accepted conservation practice.

Client: Federal Office for Building and Regional Planning, Dept. V

Performed by:eckert+honegger Architekten GmbH

Time period: 2015

Khabat Termal Power Plant, Erbil, Kurdistan, Irak

Description: Construction of an oil-fired thermal power plant with installed 300 MW in Erbil, Kurdistan, Iraq

Services: construction management and supervising the execution on clients behalf

Client: ILF Consulting Engineers, Abu Dhabi

Performed by: Projectmanagement Matthias Flocke

Time period: 2017

Development plan "Gewerbegebiet Stauf - Süd II"

Description: Development plan "Gewerbegebiet Stauf - Süd II" with environmental report and implementation

Services: Establishment of the development plan under special requirements from sound insulation, neighboring landscape protection area, protection of species and connection to existing roads. Our engineers made it possible to carry out the development plan in the standard procedure with environmental assessment.

Client: Municipality of Neumarkt i. d. Oberpfalz

Performed by: Grosser-Seeger und Partner

Time period: 2015 - 2017

Eitzweiler wind farm, Germany

Description: Enercon 1 x E82, 138 m hub height, installed power 2.3 MW, cabling 1 km

Services: project management authorisation and execution phase

Client: GERES GmbH & Co KG

Performed by: Jochen Schäfer

Time period: 2016

Porto Sokhna Resort Egypt

Description: survey and assessment of damage to constructions in the AMEG Group Porto Sokhna resort in Egypt

Services: viewing and assessment of building and slope damage to a major resort facility (ca. 2.5 million m² surface area) on the Red Sea. Presentation of the results and creation of a monitoring concept, including necessary geotechnical ground investigations

Client: TÜV Nord Egypt

Performed by: GUBING GROUP International GmbH

Time period: seit 2015

SaarPfalz wind farm

Description: Enercon 3xE82, 5xE92, 6xE101 138 m / 135 m hub height, installed power 36.95 MW, cabling 45 km Services: project management for the approval and execution phase

Leistung: Projektleitung, Genehmigungs- und Ausführungsphase

Client: GERES mbH & Co KG

Performed by: Jochen Schäfer

Time period: 2013 - 2015

New construction of a research and development building for Audi AG

Description: New construction of a research and development building for transmission and emissions at the site of Audi AG in Ingolstadt

Service: Structural Design, supervision of construction, dynamic load investigations and earthquake measurement

Client: AUDI AG, Ingolstadt

Performed by: K+S Engineering-Consult GmbH & Co.KG

Time period: 2007 - 2010

Saadiyat Bridge Abu Dhabi

Description: New bridge to the Saadiyat Island, Abu Dhabi, VAE, prestressed boxgirder bridge of 6 units in cremental launching free cantilever, distribution bridge ramps for 10 lanes and light rail.

Service: Engineering: value added design, incremental launching, optimized design, optimized erection method, scaffolding method, complete detailed design and shop drawings. Management and technical coordination and consulting supervision.

Client: Dywidag Bau GmbH, Nuremberg

Performed by: K+S Engineering-Consult GmbH & Co.KG

Time period: 2007 - 2009

Construction of the U3 underground railway line

Description: Construction of the U3 underground railway line in Nuremberg: work on a partial section for the "Kaulbachplatz" underground railway station

Service: Structural planning (structural analysis) and detail design (plans for shell and reinforcement)

Client: ARGE U3 Nordwest, Hochtief AG und BK Infrastruktur (Max Bögl) via INGE U3 Nordwest, K+S Ingenieur-Consult GmbH & Co. KG, rbz Ingenieurconsult GmbH and Ingenierbüro Schöppler Noack Neger

Performed by: isn²

Time period: 2007 - 2011

Construction of Büschl-Gewerbepark [Büschl Industry Park]

Description: Creation of a business park on the former AGFA site in Giesing, Munich, consisting of two four-storey office buildings, a fourteen-storey skyscraper and a five-storey hotel above a two-storey underground car park.

Service: Phase 5 "detail planning" in accordance with Section 64 of the HOAI (German Fee Structure for Architects and Engineers) (edition 2001)

Client: Bauwens Construction GmbH & Co. KG

Performed by: isn²

Time period: 2008 - 2011

Südklinikum Nürnberg [Nuremberg South Clinic]

Description: Development plan for Südklinikum Nürnberg [Nuremberg South Clinic], around 16 hectares of special usage area with different construction dimensions

Service: Development plan, plan for the layout of green spaces, environmental report, special examination in relation to endangered species

Client: Nuremberg Clinic

Performed by: Büro Grosser-Seeger

Time period: 2011 - 2012

Qatar Phase VIII and Phase-10 Transmission System Expansion, Qatar

Description: construction of 15 transformer stations
(400/220/132/66/11 kV) and approximately 150 km cable lines on Phase VIII and construction, replacement or upgrade of 21 transformer stations (220/66/11 kV) and construction of 20 cable routes on PHASE-10 projects

Service: Consultant for the awarding authority – Project management, design and plan approval, organisation and supervision of partial and final acceptances, checking of schedules and costs

Client: Lahmeyer International Qatar, Qatar General Electricity & Water Corporation (Kahramaa)

Performed by: Gisbert Peters

Time period: 2008 - 2014

Qurayyah power station, Dammam, Saudi Arabia

Description: gas turbine power station with a rated output of 1.8 GW (electrical), 15 GE gas turbines, each with a power output of 125 MW

Service: consulting construction engineer

Client: Lahmeyer International GmbH, Bad Vilbel, Saudi Electricity Company

Performed by: Matthias Flocke

Time period: 2009 - 2011

Underground car park at Alexanderplatz, Berlin

Description: construction of a three-storey underground car park at Alexanderplatz

Service: Project supervision, contract management and claim management

Client: Wöhr und Bauer GmbH

Performed by: Alexander Wurm

Time period: 2008 - 2010

'Am Markgrafenpark', 10969 Berlin, Germany

Description: new four-storey office building, three residential buildings, one child day care centre, approx. 95,000 m²

Service:
· Preliminary/final design
· Building permission application design
· Execution design
· Tender
· Architectual supervision of the whole project
· Overall coordination of planning and construction approval

Client: DBM Holding GmbH & Co. Bürobauten KG
Markgrafenpark GmbH & Co. KG

Performed by:Eckert+Honegger Architekten GmbH

Time period: 2000 - 2009

CSA steel works, Rio de Janeiro, Brazil

Description: construction of new steelworks to manufacture 5 million tonnes of steel per year

Service: coordination of the foundation and concrete works

Client: ThyssenKrupp

Performed by: Matthias Flocke

Time period: 2006 - 2009

Qatar Petroleum Groundwater Assessment and Monitoring Project

Description: recording, examination and risk assessment of contaminated areas used by the oil and gas industry and suspected of being contaminated, with a total area of over 600 km² in the Emirate of Qatar

Service: senior environmental consultant

Client: Dornier Consulting, Gesellschaft für Technische Zusammenarbeit - GTZ / Qatar Petroleum

Performed by: Hans-Werner Jürges

Time period: 2003, 2008 / 2009

Abu Dhabi Water Supply Emergency Plan, Abu Dhabi

Description: recording, evaluation of the state of public and private water supply infrastructure in the Emirate of Abu Dhabi

Service: senior environmental consultant

Client: Dornier Consulting, Gesellschaft für Technische Zusammenarbeit - GTZ

Performed by: Hans-Werner Jürges

Time period: 2009

Poland Geotech Project, Poland

Description: Hydro-geological and geotechnical survey of a former military airbase as a potential location for American missile defences in Poland

Service: management of surveying

Client: URS Corporation Germany / US Department of Defense

Performed by: Hans-Werner Jürges

Time period: 2008

Riedelberg wind farm, Germany

Description: Enercon 2 x E70/4 & 2xE82, 98m hub height, installed output 8.6 MW, cabling 12.2km

Service: project management

Client: GERES EnergieSysteme Süd GmbH & Co KG

Performed by: Jochen Schäfer

Time period: 2008

Residential and retail project development in Hamm, Germany

Description: 250 residential and retail units, 'Grüne Mark' residential area, approx. 110,000 m² on the site of former army barracks

Service: project management of project development for B-plan process, dealing with the authorities, preparing the land and cleaning up contamination, dismantling, infrastructure, plotting and construction

Client: investor, small/medium sized construction company

Performed by: Dr. Ulrich Güttler, BS Consult

Time period: 2001 - 2008

Valuation of school buildings in Berlin, Germany

Description: Valuing 48 school buildings on the basis of a precise building survey

Service: valuing school buildings on the basis of DIN 276 and DIN 277 for cost groups 200 to 600, each to the 3rd cost classification level

Client: District Authority of Friedrichshain / Kreuzberg, Berlin

Performed by: GUBING group GbR

Time period: 2007

Operational assessment of Neftochim TPP, Burgas, Bulgaria

Description: a thermal power plant, built in 1960, with 12 boilers including all associated infrastructure (cooling towers, water preparation, transformer stations etc.) was tested to find out its condition and degree of effectiveness during operation at full power and its efficiency.

Service: all tests and evaluations carried out from a construction and environmental point of view.

Client: Lahmeyer International GmbH, Bad Vilbel; LUKOIL, Bulgaria

Performed by: Gisbert Peters

Time period: 2006 / 2007

Construction Monitoring of a medical centre in Berlin, Germany

Description: new construction of a six-storey medical centre with X-ray facilities

Service: checking of planning and progress of construction on behalf of the foreign investor. Regular construction site inspections with reporting.

Client: Land America Assessment Corporation, Frankfurt am Main on behalf of the investor

Performed by: GUBING group GbR

Time period: 2006 / 2007

Soil sanitation for Novoktan GmbH

Description: renovation of approx. 10,000 tonnes of widespread lead alkaline ground contamination using large hole bores

Service: management of surveying, safety coordinator (German Institution for Statutory Insurance and Prevention Rule BGR 128)

Client: Harress Pickel Consult AG / NOVOKTAN GmbH

Performed by: Hans-Werner Jürges

Time period: 2006

Heidkopftunnel, Germany

Description: A38 motorway tunnel between Göttingen and Halle; length 1,724 m, two tubes, bored construction

Service: construction manager, representative for the awarding authority

Client: DEGES

Performed by: Walter Dewner

Time period: 2003 - 2006

Garri 4 Power Plant, Sudan

Description: examination of the foundations of the coal-fired power station Garri 4 in Sudan

Service: viewing and evaluation of the geotechnical examination programme; testing and monitoring of the geotechnical surveys on the power plant. Evaluation report and opinion on the final geotechnical report.

Client: Lahmeyer International GmbH, Bad Vilbel, on behalf of the National Electricity Corporation, Khartoum, Sudan (NEC)

Performed by: Gisbert Peters

Time period: 2005

Zuara Desalination Plant, Libya

Description: construction of a desalination facility at Zuara, Libya

Service: making reports on incorrectly manufactured concrete cladding on the seawater intake pipe and evaluation of the sanitation process.

Client: Lahmeyer International GmbH, Bad Vilbel, on behalf of the General Electric Company of Libya (GECOL)

Performed by: Gisbert Peters

Time period: 2005

Due diligence of a pre-fabricated residential housing, Dresden, Germany

Description: prefabricated residential housing in Dresden with approx. 1,900 residential units and approx. 115,000 m² of residential surface area was evaluated in terms of construction and environmental aspects.

Service: technical and environmental due diligence

Client: Schmidt und Pütz Projektmanagement GmbH, Berlin

Performed by: Janet Seker, Joachim Stadelmaier, Gisbert Peters

Time period: 2004

Renewal of the railway bridge over the River Enz, Bietigheim, Germany

Description: renewal of an existing railway bridge with the construction of a new bridge over the River Enz at Bietigheim

Service: Project management and project control, carrying out the approval process

Client: BUNG AG, Heidelberg, Stuttgart on behalf of DB ProjektBau GmbH, Stuttgart

Performed by: Gisbert Peters

Time period: 2004

Production hall for steel sections, Bönen, Germany

Description: production hall for steel sections made of steel frame construction with a driven pile foundation, approx. 400,000 m³ of enclosed space

Service: underground engineering project management, shell and infrastructure

Client: Welser Profile

Performed by: Dr. Ulrich Güttler

Time period: 2002

Limburg tunnel, Germany

Description: length 2395 m, one tube, bored construction

Service: deputy construction coordinator for tunnelling and inner shell

Client: DB Projektbau GmbH

Performed by: Jochen Schäfer

Time period: 1997 - 2002

Construction of a goods distribution centre in Dortmund, Germany

Description: prefabricated concrete construction, site-mixed concrete parts, removal dismantling of existing buildings, sewer construction, construction of roads, finishing, building services, approx. 200,000 m², including traffic areas, approx. 600,000 m³ of enclosed space

Service: project management of underground construction and infrastructure

Client: Lidl und Schwarz Immobilien

Performed by: Dr. Ulrich Güttler

Time period: -

Culverts in pipe tunnelling process, Hamm, Germany

Description: culverts, length approx. 120 m, pipeline curved upwards throughout its length

Service: project management for underground construction, special foundations, pipe tunnelling

Client: Wasser und Schiffartsamt Rheine

Performed by: Dr. Ulrich Güttler

Time period: 1998

Berlin main station (formerly Lehrter station), Germany

Description: construction of transportation interchange for national and local rail traffic, city suburban railway and underground railway including car tunnel and underground car park

Service: project management in the field of overall project management, waste management and disposal for the construction site, waste management for the demolition of Berlin-Lehrter station, planning and construction management for the excavation pits, project management when demolishing the signalling and safety systems, taking care of construction supervision

Client: -

Performed by: Walter Dewner, Gisbert Peters, Janet Seker

Time period: 1998 - 2003

Potsdamer Platz (Potsdam Square), Berlin, Germany

Description: construction of the excavation pits at Potsdamer Platz

Service: technical supervision as a construction coordinator during the construction of the excavation pits, issuing a report and acceptance tests for the excavation pits to submit to the German railway authorities

Client: -

Performed by: Gisbert Peters, Herwig Kolloff

Time period: 1996 - 1998