Make our experience your benefit.

GUBING GROUP International works for many companies in the public and private sector. We therefore gain experience that we are happy to pass on to you. Take a look at our work and then contact us. We are sure that we can do something for you.

 

Qatar Phase VIII Transmission System Expansion, Qatar

Description: construction of 15 transformer stations
(400/220/132/66/11 kV) and approximately 150 km cable lines

Service: Consultant for awarding authority –
Management of the construction areas of:
Project management, testing and approval of plans, organisation and supervision of partial and final acceptances, checking of schedules and costs

Client: Lahmeyer International Qatar, Qatar General Electricity & Water Corporation (Kahramaa)

Time period: 2008 - 2012

Qurayyah power station, Dammam, Saudi Arabia

Description: gas turbine power station with a rated output of 1.8 GW (electrical), 15 GE gas turbines, each with a power output of 125 MW

Service: consulting construction engineer

Client: Lahmeyer International GmbH, Bad Vilbel, Saudi Electricity Company

Time period: 2009 - 2011

Underground car park at Alexanderplatz, Berlin

Description: construction of a three-storey underground car park at Alexanderplatz

Service: Project supervision, contract management and claim management

Client: Wöhr und Bauer GmbH

Time period: 2008 - 2010

Sustainability certification

Description: high-rise office building, built in 2005, approx. 42,000 m² of rented space

Service: pre-assessment for sustainability certification in accordance with LEED, BREEAM or DGNB

Client: -

Time period: 2009

'Am Markgrafenpark', 10969 Berlin, Germany

Description: new four-storey office building, three residential buildings, one child day care centre, approx. 95,000 m²

Service:
· Preliminary/final design
· Building permission application design
· Execution design
· Tender
· Architectual supervision of the whole project
· Overall coordination of planning and construction approval

Client: DBM Holding GmbH & Co. Bürobauten KG
Markgrafenpark GmbH & Co. KG

Time period: 2000 - 2009

CSA steel works, Rio de Janeiro, Brazil

Description: construction of new steelworks to manufacture 5 million tonnes of steel per year

Service: coordination of the foundation and concrete works

Client: ThyssenKrupp

Time period: 2006 - 2009

Qatar Petroleum Groundwater Assessment and Monitoring Project

Description: recording, examination and risk assessment of contaminated areas used by the oil and gas industry and suspected of being contaminated, with a total area of over 600 km² in the Emirate of Qatar

Service: senior environmental consultant

Client: Dornier Consulting, Gesellschaft für Technische Zusammenarbeit - GTZ / Qatar Petroleum

Time period: 2003, 2008 / 2009

Green building support, Germany

Description: high-rise office building, built in 1974, modernisation in 2004, approx. 20,500 m² of rented space

Service: thermal building insulation, energy efficiency analysis, green building support

Client: -

Time period: 2009

Abu Dhabi Water Supply Emergency Plan, Abu Dhabi

Description: recording, evaluation of the state of public and private water supply infrastructure in the Emirate of Abu Dhabi

Service: senior environmental consultant

Client: Dornier Consulting, Gesellschaft für Technische Zusammenarbeit - GTZ

Time period: 2009

Energy consulting, Germany

Description: office building, built in 2002, approx. 13,000 m² of rented space

Service: thermal building simulation, calculation of cost-effectiveness of energy conservation measures

Client: -

Time period: 2009

Poland Geotech Project, Poland

Description: Hydro-geological and geotechnical survey of a former military airbase as a potential location for American missile defences in Poland

Service: management of surveying

Client: URS Corporation Germany / US Department of Defense

Time period: 2008

Environmental due diligence, London, UK

Description: office building in London, built in 1990, approx. 18,700 m² of rented space

Service: environmental due diligence, asbestos examination

Client: -

Time period: -

Riedelberg wind farm, Germany

Description: Enercon 2 x E70/4 & 2xE82, 98m hub height, installed output 8.6 MW, cabling 12.2km

Service: project management

Client: GERES EnergieSysteme Süd GmbH & Co KG

Time period: 2008

Residential and retail project development in Hamm, Germany

Description: 250 residential and retail units, 'Grüne Mark' residential area, approx. 110,000 m² on the site of former army barracks

Service: project management of project development for B-plan process, dealing with the authorities, preparing the land and cleaning up contamination, dismantling, infrastructure, plotting and construction

Client: investor, small/medium sized construction company

Time period: 2001 - 2008

Valuation of school buildings in Berlin, Germany

Description: Valuing 48 school buildings on the basis of a precise building survey

Service: valuing school buildings on the basis of DIN 276 and DIN 277 for cost groups 200 to 600, each to the 3rd cost classification level

Client: District Authority of Friedrichshain / Kreuzberg, Berlin

Time period: 2007

Technical and environmental due diligence, France

Description: office building in France, built in 1995, approx. 5,400 m² of rented space

Service: technical and environmental due diligence

Client: -

Time period: 2007

Operational assessment of Neftochim TPP, Burgas, Bulgaria

Description: a thermal power plant, built in 1960, with 12 boilers including all associated infrastructure (cooling towers, water preparation, transformer stations etc.) was tested to find out its condition and degree of effectiveness during operation at full power and its efficiency.

Service: all tests and evaluations carried out from a construction and environmental point of view.

Client: Lahmeyer International GmbH, Bad Vilbel; LUKOIL, Bulgaria

Time period: 2006 / 2007

Monitoring the progress of construction of a medical centre in Berlin, Germany

Description: new construction of a six-storey medical centre with X-ray facilities

Service: checking of planning and progress of construction on behalf of the foreign investor. Regular construction site inspections with reporting.

Client: Land America Assessment Corporation, Frankfurt am Main on behalf of the investor

Time period: 2006 / 2007

Soil sanitation for Novoktan GmbH

Description: renovation of approx. 10,000 tonnes of widespread lead alkaline ground contamination using large hole bores

Service: management of surveying, safety coordinator (German Institution for Statutory Insurance and Prevention Rule BGR 128)

Client: Harress Pickel Consult AG / NOVOKTAN GmbH

Time period: 2006

Heidkopftunnel, Germany

Description: A38 motorway tunnel between Göttingen and Halle; length 1,724 m, two tubes, bored construction

Service: construction manager, representative for the awarding authority

Client: DEGES

Time period: 2003 - 2006

Garri 4 Power Plant, Sudan

Description: examination of the foundations of the coal-fired power station Garri 4 in Sudan

Service: viewing and evaluation of the geotechnical examination programme; testing and monitoring of the geotechnical surveys on the power plant. Evaluation report and opinion on the final geotechnical report.

Client: Lahmeyer International GmbH, Bad Vilbel, on behalf of the National Electricity Corporation, Khartoum, Sudan (NEC)

Time period: 2005

Zuara Desalination Plant, Libya

Description: construction of a desalination facility at Zuara, Libya

Service: making reports on incorrectly manufactured concrete cladding on the seawater intake pipe and evaluation of the sanitation process.

Client: Lahmeyer International GmbH, Bad Vilbel, on behalf of the General Electric Company of Libya (GECOL)

Time period: 2005

Due diligence of a pre-fabricated residential housing in Dresden, Germany

Description: prefabricated residential housing in Dresden with approx. 1,900 residential units and approx. 115,000 m² of residential surface area was evaluated in terms of construction and environmental aspects.

Service: technical and environmental due diligence

Client: Schmidt und Pütz Projektmanagement GmbH, Berlin

Time period: 2004

Renewal of the railway bridge over the River Enz at Bietigheim, Germany

Description: renewal of an existing railway bridge with the construction of a new bridge over the River Enz at Bietigheim

Service: Project management and project control, carrying out the approval process

Client: BUNG AG, Heidelberg, Stuttgart on behalf of DB ProjektBau GmbH, Stuttgart

Time period: 2004

Production hall for steel sections, Bönen, Germany

Description: production hall for steel sections made of steel frame construction with a driven pile foundation, approx. 400,000 m³ of enclosed space

Service: underground engineering project management, shell and infrastructure

Client: Welser Profile

Time period: 2002

Limburg tunnel, Germany

Description: length 2395 m, one tube, bored construction

Service: deputy construction coordinator for tunnelling and inner shell

Client: DB Projektbau GmbH

Time period: 1997 - 2002

Construction of a goods distribution centre in Dortmund, Germany

Description: prefabricated concrete construction, site-mixed concrete parts, removal dismantling of existing buildings, sewer construction, construction of roads, finishing, building services, approx. 200,000 m², including traffic areas, approx. 600,000 m³ of enclosed space

Service: project management of underground construction and infrastructure

Client: Lidl und Schwarz Immobilien

Time period: -

Culverts in pipe tunnelling process, Hamm, Germany

Description: culverts, length approx. 120 m, pipeline curved upwards throughout its length

Service: project management for underground construction, special foundations, pipe tunnelling

Client: Wasser und Schiffartsamt Rheine

Time period: 1998

Berlin main station (formerly Lehrter station), Germany

Description: construction of transportation interchange for national and local rail traffic, city suburban railway and underground railway including car tunnel and underground car park

Service: project management in the field of overall project management, waste management and disposal for the construction site, waste management for the demolition of Berlin-Lehrter station, planning and construction management for the excavation pits, project management when demolishing the signalling and safety systems, taking care of construction supervision

Client: -

Time period: 1998 - 2003

Potsdamer Platz (Potsdam Square), Berlin, Germany

Description: construction of the excavation pits at Potsdamer Platz

Service: technical supervision as a construction coordinator during the construction of the excavation pits, issuing a report and acceptance tests for the excavation pits to submit to the German railway authorities

Client: -

Time period: 1996 - 1998